A concrete placing boom is used to deliver concrete evenly over the area of a floor slab without frequently moving the hose by hand — correct selection of length and mounting method directly affects the pouring pace.
Boom length and coverage area
The boom's coverage zone should cover all or most of the area of the slab being poured from one mounting point — insufficient length increases the number of repositionings and lengthens the floor concreting cycle.
Mounting method: column, carriage, stationary support
The choice between a relocatable column, a carriage mounted on the structure being built and a stationary support depends on the number of floors of the site and the schedule of boom repositioning as the building grows.
Compatibility with the truck-mounted concrete pump
A concrete placing boom receives mix from the pipeline of a truck-mounted or stationary pump — it is important to agree in advance the connection point and pipeline diameter between the systems.
CHECKLIST
Compare the boom's coverage zone with the area of the site's typical floor; choose the mounting method for the number of floors and the repositioning schedule; agree the connection point and pipeline diameter in advance.